Search For Parts
Search
 

Gas Turbine Operations Mark VI Controls

Controls Training for Turbine Operators

This program is intended for all control technicians and engineers, no matter their level of experience. The training will offer the attendees in-depth knowledge to work with the Mk VI control system in application with the gas turbine. This training will familiarize them with the hardware and software components of the control system. It will develop strong skills in process alarm troubleshooting and analysis of the control code. Additional training includes LVDT calibration, control interface (Cimplicity HMI) software programming, sequence editing and diagnostic alarm troubleshooting. A Mark VI simulator will be used to provide the participants with some hands on training.

Course Duration: 10 Days

Course Outline

Day 1

  • Course outline / objectives
  • Equipment review
  • Overview of turbine / control systems
  • GE documentation conventions
  • Control Specs
  • Piping Schematics
  • I/O report
  • Panel / network layout

Day 2

  • Controls Fundamentals
  • TMR operation / design philosophy
  • Panel layout
  • Introduction to operator interface(HMI) configuration

Day 3

  • HMI / Mk VI file structure
  • Operator interface (HMI) displays
  • Introduction to graphics application software (Cimplicity)
  • Introduction to controller application software (Toolbox)

Exercise:
Finder (the application software search engine)

Day 4

  • Introduction to software configuration

Exercise:
Signal Tracing VPRO configuration / protection software Blockware concepts and diagrams

Day 5

  • Blockware functions and algorithms

Exercise:
Alarm Trace #1
Alarm Trace #2
Alarm Trace #3

Day 6

  • Forcing signals / changing control constants

Exercise:
Toolbox: Logic and Analog Forcing / Control Constants

Introduction to signal data base (SDB) Exercise:
Using the SDB

Day 7

  • Hardware configuration
  • LVDT calibration procedure

Exercise:
LVDT Calibration

Day 8

  • Sequencing editing
  • Adding software changes
  • Validation / build /download

Exercise:
Adding I/O and Alarm
Cimplicity #2
Adding a Macro

Day 9

  • Troubleshooting / diagnostics

Exercise:
Toolbox: “Ready to Start”
Trending

Exercise:
Toolbox: Trending

Day 10

  • Trip history
  • Mk VI toolbox graphics / data collection
  • Questions & Answers / Review / Final Test

Spaces are limited. Register now to reserve your seat.

Register Now