Search For Parts
Search
 

Mark V Health Check

Onsite Operational Solutions

Gas Turbine Controls (GTC) offers operators a health check for their Mark V controls systems. This procedure involves a trained GTC Speedtronic™ engineer visiting your site and performing a set of tests to fully examine your Mark V system.

At the end of the check, a GTC engineer will create a full report to hand over to you advising the state of the panel and give any recommendations (if any) that should be carried out to restore the Mark V to operate efficiently without errors.

The test takes two days onsite and all minor errors found during examination will be corrected onsite in an effort to prolong the life of the Mark V. Any major faults found will be detailed in the report and discussed with you at site before rectifying.

Learn more about our health checks for Mark V controls systems.

Contact Us